
How to stake a mineral claim in British Columbia
In British Columbia, "staking" a new mineral claim is mostly an online transaction. An applicant selects cells on the Mineral Titles Online (MTO) map, submits an application and pays the calculated fee. Since March 2025, the Province consults potentially affected First Nations before deciding whether to register the claim.
| What you need | Claim fees | Cell limit |
|---|---|---|
| Business BCeID and a valid Free Miner Certificate | $1.75/ha mineral · $5.00/ha placer | Up to 100 adjoining cells per submission |
| Application submitted through MTO | First Nations consultation occurs before registration | After approval, maintain the claim and permit any proposed work |
What "staking" means in British Columbia
British Columbia no longer relies on the traditional system of driving physical claim posts into the ground for new cell claims. The modern process uses a provincial grid displayed in Mineral Titles Online, usually abbreviated as MTO.
An applicant selects one or more adjoining cells on the live electronic map. Each cell represents a defined geographic area and the registered claim covers the available Crown-owned mineral rights within those boundaries, subject to existing titles, reserves, parks, Crown grants and other legal interests.
Cells are approximately 21 hectares in southern British Columbia and become smaller toward the north as lines of longitude converge. A single claim application can contain up to 100 adjoining cells. MTO calculates the precise area and fee.
Mineral claims versus placer claims
The first decision is whether the target requires mineral rights or placer rights. These are separate legal interests and are not interchangeable.
| Claim type | Typically covers | Important limitation |
|---|---|---|
| Mineral claim | Minerals occurring in bedrock, including many metallic and industrial mineral targets. | Does not authorize placer activity or confer ownership of the surface. |
| Placer claim | Placer minerals in unconsolidated material such as stream gravels, benches and buried channels. | Can only be acquired inside designated placer claim or placer lease areas. |
Accounts and licences required
Business BCeID
Anyone who wants to acquire or maintain a mineral or placer title in MTO needs a Business BCeID. Individuals generally enrol as a proprietorship, while corporations and partnerships select the appropriate business category. The public can view maps and search title information without logging in.
Free Miner Certificate (FMC)
A valid Free Miner Certificate is required when applying for a new claim, acquiring an interest in an existing title, registering exploration and development work, or registering a payment instead of work. It is an eligibility certificate for mineral-title transactions — not a general mining permit.
| Applicant | Annual FMC fee |
|---|---|
| Individual | $25 |
| Individual age 65 or older | $0 |
| Corporation | $500 |
Individuals generally must be at least 18 and meet the residency or Canadian work-authorization requirements described by the Province. Corporate and partnership eligibility depends on registration under the applicable B.C. legislation.
How Mineral Titles Online works
MTO is the Province's official electronic mineral-title registry and transaction system. It combines a public map and search interface with logged-in functions used by free miners and recorded holders.
Public functions
- View mineral, placer and coal title maps.
- Search claim, lease, owner and reserve information.
- Review tenure details, boundaries and recorded title events.
- Inspect apparent overlaps and land-status constraints before applying.
Logged-in transactions
- Apply for new mineral or placer claims and pay the calculated fee.
- Register exploration and development work or cash-in-lieu payments.
- Transfer interests, abandon claims and perform other title transactions.
- Maintain client information and Free Miner Certificate status.
Step-by-step claim application process
- 1Set up access
Obtain a Business BCeID and a valid Free Miner Certificate before starting an application.
- 2Research the ground
Start with the MTO map, but do not stop there. Confirm whether the mineral or placer rights appear open, then investigate private land, roads, parks, reserves, Crown grants, existing titles, watercourses, forestry activity, Indigenous territories, practical access and the available geological data.
- 3Select adjoining cells
Select one or more adjoining cells in the appropriate MTO map. Mineral claims can generally be applied for where Crown mineral rights are available and no impeding interest prevents acquisition. Placer claims are limited to designated placer areas.
- 4Confirm and pay
MTO calculates the area and application fee — $1.75 per hectare for a mineral claim and $5.00 per hectare for a placer claim. The fee is calculated for the selected cells even if part of a cell is affected by a prior legacy title or alienated land.
- 5Receive the application number
After successful payment, MTO issues an application number and sends an email confirmation. At this point, the applicant has an application — not yet a registered claim.
- 6Consultation and provincial decision
Under the Mineral Claims Consultation Framework, the Province prepares consultation materials and refers the application to potentially affected First Nations. The published stages are Application Submitted, Consultation Initiated and Application Decision. The final decision can be approval, denial or withdrawal.
- 7Registration and Good To Date
If approved, the claim is registered with a Date of Issue and a Good To Date, generally one year after registration. The recorded holder is responsible for maintaining the claim before that date — the Province does not guarantee a pending-forfeiture reminder.
What a claim does — and does not — authorize
A claim secures mineral rights. A permit authorizes work. Keeping these two concepts separate prevents one of the most common mistakes made by new claim holders.
| Mineral or placer claim | Mines Act authorization |
|---|---|
| Recorded interest in available Crown mineral rights | Approval for specified exploration or mining activities |
| Defined by the MTO cell grid | Usually required for drilling, trenching and road work |
| Must be maintained before its Good To Date | Reviewed through the regional permitting process |
| Does not grant surface ownership or unrestricted access | May include maps, reclamation plans and financial security |
| Does not, by itself, approve mechanized exploration | Other provincial, federal or local approvals can still apply |
A registered claim gives the holder an interest in the applicable available Crown mineral rights within the claim boundaries. It does not transfer ownership of the surface and does not create a private recreational property.
A claim does not automatically provide unrestricted access across private property, authority to build structures, timber rights, water rights, permission to hunt or fish, or approval to conduct mechanized exploration. Other land users and legal interests remain in place.
General exploration and access rules
Most mineral exploration activities involving mechanical disturbance or excavation require a regional Mines Act permit. Applications for exploration permits under section 10 of the Mines Act are generally called Notice of Work applications.
Activities that usually require a permit
- Mechanized drilling.
- Excavator or backhoe trenching and mechanized test pits.
- Road, trail or air-access development.
- Bulk sampling, blasting and substantial ground disturbance.
- Associated site preparation and reclamation work.
Low-impact activities that may not require a Mines Act permit
The Province lists certain non-invasive activities that may fall outside the permit requirement, including airborne geophysics, baseline mapping and photography, some ground geophysics without exposed electrodes, hand soil or rock sampling, and limited hand pitting, trenching or drilling that meets prescribed conditions:
- No explosives or expanding grout.
- No more than 3 cubic metres for each hand pit or trench.
- Maximum depth of 1.2 metres.
- No more than five unreclaimed pits or trenches at one time.
- No work within a stream or the applicable riparian setback.
These are not blanket permissions. The activity may still require other approvals because of vegetation disturbance, water use, heritage resources, private land, access, wildlife, forestry or the specific site conditions. When uncertain, contact the regional mines office before beginning work.
Keeping the claim in good standing
A claim does not remain valid indefinitely. Before the Good To Date, the recorded holder must register eligible exploration and development work or register a payment instead of work. All recorded holders must have valid FMCs when the maintenance event is registered.
| Anniversary year | Eligible work ($/ha) | Cash in lieu ($/ha) |
|---|---|---|
| Years 1–2 | $5 | $10 |
| Years 3–4 | $10 | $20 |
| Years 5–6 | $15 | $30 |
| Year 7+ | $20 | $40 |
Placer claims require $20/ha of eligible work or $40/ha cash in lieu each year.
Exploration work can include qualifying physical and technical activities such as geological, geochemical and geophysical work, prospecting, sampling, trenching, drilling, reclamation and certain technical studies. Depending on the work and value claimed, a formal assessment report may be required.
Registering work is a two-step process: first register the statement of work in MTO, then submit the required assessment report to Mineral Titles. Work should generally be registered within one year after it is completed.
Common mistakes and a practical checklist
Common mistakes
- Assuming payment creates an immediate claim rather than an application.
- Selecting a mineral claim when the target requires placer rights, or vice versa.
- Treating an apparent open cell as proof of clear access and complete mineral rights.
- Confusing a Free Miner Certificate or claim with a Mines Act permit.
- Entering private land or using private roads without confirming the applicable requirements.
- Beginning mechanized work before approvals are in place.
- Letting an FMC expire before registering work or a cash-in-lieu payment.
- Waiting until the Good To Date to maintain the claim.
Before submitting a claim application
- Obtain a Business BCeID and valid Free Miner Certificate.
- Decide whether the target requires mineral or placer rights.
- Confirm that the cells appear available in the appropriate MTO map.
- Investigate existing claims, reserves, parks, Crown grants and alienated land.
- Review private land, road access, topography and other surface constraints.
- Review available geology, MINFILE records and assessment reports.
- Consider potentially affected First Nations and early engagement.
- Estimate acquisition, annual maintenance and permitting costs.
- Submit and retain the MTO application confirmation and number.
- Wait for the provincial decision before treating the area as a registered claim.
- After approval, record the title number, Date of Issue and Good To Date.
- Confirm permits and other approvals before disturbing the ground.
Use MTO to secure the appropriate mineral interest, but treat consultation, access, permitting, reclamation and claim maintenance as core parts of the exploration project from the beginning.
Final perspective
British Columbia's grid-based system makes it comparatively easy to research land and submit a claim application. The online transaction, however, is only the first step in a larger mineral-tenure and permitting process.
A thoughtful applicant looks beyond whether cells appear open. The practical questions are whether the correct mineral rights are available, whether the ground can be responsibly accessed, whether the geology supports the target, how consultation and other land interests may affect the project, what permits are required, and how the claim will be maintained.
- [1]Mineral Claims Consultation Framework (MCCF) — Province of B.C.
- [2]Mineral and placer claims — Province of B.C.
- [3]New client to Mineral Titles Online — Province of B.C.
- [4]Mineral and placer title fees — Province of B.C.
- [5]Mineral Titles Online (MTO)
- [6]Mineral and coal exploration permit applications — Province of B.C.
- [7]Mineral Tenure Act
- [8]Mineral Tenure Act Regulation

